What's being built
- A renewable_energy project: Construction of the Carmody's Hill Wind Farm Development comprising: 45 wind turbine generators (maximum tip height 200m and combined generating capacity 270MW) · battery energy storage system (minimum 128MW fast frequency response) · up to 7 meteorological and power curve verification masts (maximum height 122.5m) · electrical substation with 275kV step-up transformer.
- Lodged 24 Jun 2020 with Northern Areas
- currently decision made.