What's being built
- A education project: Three sheds on site that need a basic office each.
- 2 buildings to be used for offices are used st James school building in great condition.
- Buildings are open plan one open space.
- Shed 1 transportable office to be added 7m x 9m ($15 · 000.00) Shed 2 transportable office to be added 3.5m x 9m ($7 · 500.00) Shed 3 transportable office to be added 3.5m x 9m ($7 · 500.00) Building need to be moved between 13th November and the end of November.
- Buildings will be moved in halves each load.
- Lodged 4 Dec 2021 with Northern Areas